Risk Based Improvement Performance Strategy for Operation and Maintenance Activities of River and River Infrastructure (BBWS Ciliwung-Cisadane Authority)
Abstract
The Ministry of Public Works and Public Housing (PUPR) has the duty and responsibility to carry out effective and efficient river operation activities and river infrastructure including overcoming floods during the rainy season, but these activities are deemed necessary for improvement in planning procedures. To realize this goal, it is necessary to manage risks that can reduce river performance and river infrastructure as flood control. With risk management in this activity, it is possible to apply the sequence of risks that occur which are then used as recommendations for action (risk response) and risk-based development strategies to improve river performance and river infrastructure to control floods through operation and maintenance activities to build a functional and sustainable system. Suitable for long-term planning and short-term maintenance needs.
References
Balai Besar Wilayah Sungai Ciliwung Cisadane. Laporan Hasil Survey Sungai. Jakarta: Balai Besar Wilayah Sungai Ciliwung Cisadane; 2020.
Akhbar RK. Analisis Spasial Rawan Banjir Terhadap Dampak Lingkungan Kabupaten Sigi Provinsi Sulawesi Tengah. Jurnal Warta Rimba. 2019;7(Desember 2019):172–80.
Balai Besar Wilayah Sungai Ciliwung Cisadane. Laporan Akhir Manual OP Sungai. Jakarta: Balai Besar Wilayah Sungai Ciliwung Cisadane; 2018.
Taufik M, Muttaqin M, Rauzana A. Faktor-Faktor Risiko Waktu Yang Mempengaruhi Biaya Pelaksanaan Proyek Konstruksi Gedung Di Provinsi Aceh. Jurnal Arsip Rekayasa Sipil dan Perencanaan. 2018;1(4):156–63.
Azwar S. Metode Penelitian. Yogyakarta: Pustaka Pelajar Handoko; 2013.
Yin RK. Studi Kasus (Desain dan Metode). Vol. 3, Adoption Quarterly. Jakarta: PT. Raja Grafindo; 2000.
Siwi Agustiningsih E. Pengelolaan Risiko dalam Kegiatan Operasi dan Pemeliharaan Jaringan Irigasi untuk Meningkatkan Kinerja Jaringan Irigasi. Jakarta: Universitas Indonesia; 2014.
Asiyanto. Manajemen Risiko Untuk Kontraktor. Jakarta: Pradnya Paramita; 2009.
Kezner H. Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley & Sons; 2009.
Pramesti NP. Studi Manajemen Pemeliharaan Aset Pada Infrastruktur Sungai (Studi Kasus Bangunan Revetment Sungai Pepe Di Surakarta). Konferensi Nasional Teknik Sipil 11. 2017;239–46.
Direktorat Jenderal Sumber Daya Air Kementerian Pekerjaan Umum dan Perumahan Rakyat. Surat Edaran Direktur Jenderal SDA Kementerian PUPR Nomor 05/SE/D/2016 tentang Pedoman Penyelenggaraan Kegiatan Operasi dan Pemeliharaan Prasarana Sungai Serta Pemeliharaan Sungai. Jakarta: Direktorat Jenderal Sumber Daya Air Kementerian Pekerjaan Umum dan Perumahan Rakyat; 2016.
Purwanti H, Pontiawaty I. Manajemen Risiko pada Pengendalian Banjir di Sungai Ciliwung. Jurnal Teknologi. 2013;I(Juli-Desember 2013):21–32.
Susanti E, Carlo N, Nursaifi Yulius M. Analisis Faktor-Faktor yang Mempengaruhi kinerja Operasi dan Pemeliharaan Jaringan Irigasi di Kota Sungai Penuh. 2013;1–18.
Maddeppungeng A, Bethary RT, Ayu S. Identifikasi Faktor-Faktor Risiko yang Berpengaruh Terhadap Kinerja Waktu ( Studi Kasus PT . Krakatau Engineering dan PT . Prima Konstruksi Utama ). Jurnal Fondasi. 2015;4(2):88–95.
Susila H, Handoyo S. Analisis Faktor Dominan Risiko Biaya pada Pelaksanaan Proyek Konstruksi Gedung di Surakarta. 2016;203–18.
Copyright (c) 2021 Isni Septima Anindhita
This work is licensed under a Creative Commons Attribution 4.0 International License.